Drone: specifications, flight rules and reconnaissance sheet
November 12, 2026
Quick-reference data. The specifications are for the DJI Neo 2, the drone used in the project, which we flew in the field with the remote controller and a phone. For another model, look for the same items in the manufacturer’s manual.

DJI Neo 2 specifications
Source: DJI’s official specifications.
| Item | Value | What to look for in another drone |
|---|---|---|
| Take-off weight | 151 g; 160 g with the optional digital transmitter | Up to 250 g simplifies ANAC rules |
| Maximum flight time | about 19 min; 17 min with propeller guards | At least 15 min per battery |
| Maximum hover time | about 18 min; 16.5 min with guards | Useful for watching a fixed point |
| Wind resistance | 10.7 m/s (level 5) | The higher the better after storms |
| Operating temperature | -10 °C to 40 °C | Take care near fires and in the heat |
| Water protection | not stated by the manufacturer | Do not fly in rain |
| Satellite positioning | GPS, Galileo and BeiDou | More than one system improves accuracy |
| Hover accuracy | horizontal ±1.5 m and vertical ±0.5 m by satellite | Stability for photos |
| Camera | 1/2-inch sensor, 12 MP, video up to 4K | Resolution to see roofs and streets |
| Field of view | 119.8° | A wide angle shows more ground |
| Obstacle sensing | omnidirectional vision, forward LiDAR and downward infrared; needs light above 5 lux | Works worse at night and in smoke |
| Video transmission with phone only | Wi-Fi, effective range of 500 m in open areas | Real range drops with buildings and trees |
| Transmission with transmitter and controller | up to 6 km in open areas without interference (CE standard); 0 to 0.5 km with buildings in the way | The flight is still limited to the pilot’s sight |
| Radio bands | 2.4 GHz and 5.8 GHz | May interfere with the team’s Wi-Fi network |
| Storage | 49 GB internal, no memory card | Plan where to offload images |
| Battery | 11.5 Wh, lithium-ion | Can travel in a backpack |
| Charging | hub with 5 V to 20 V USB-C input; with a charger above 45 W it charges three batteries at once, in about 68 min at 65 W | Charge from a USB-C PD power bank or solar panel |
| Charging temperature | 5 °C to 40 °C | Do not charge in strong sun |
Flight rules in Brazil
| Rule | What it says | Source |
|---|---|---|
| ANAC registration | Drones up to 250 g need no ANAC registration or document | ANAC Resolution No. 806/2026 (in Portuguese) |
| Line of sight | The pilot, or an observer, must see the drone directly, without lenses or screens | ANAC Resolution No. 806/2026 |
| Maximum height | 120 m above ground | ANAC Resolution No. 806/2026 |
| Privacy | Respect people’s privacy, private life and image | ANAC Resolution No. 806/2026 |
| Flight authorisation | Every flight needs authorisation on SARPAS , including drones up to 250 g | ICA 100-40 (DECEA) (in Portuguese) |
| Lead time | 30 minutes for simple flights, in line of sight, up to 120 m and outside restricted areas | ICA 100-40 |
| FPV goggles | Flying with video goggles requires an observer alongside | ICA 100-40 |
| Weather | Flying in rain, wind or fog that puts the flight at risk is prohibited | ICA 100-40 |
| Priority | Flights by public climate disaster response and security agencies have priority | ICA 100-40 |
| Ending the flight | End the flight immediately if a crewed aircraft or a drone from a public response or security agency approaches | ICA 100-40 |
| Security areas | Dams, substations, power lines and water and gas networks may have flight restrictions | ICA 100-40 |
| Loss of control | Notify SARPAS Tactical with the last position, altitude, speed and endurance | ICA 100-40 |
| Termination plan | Define emergency landing spots before the flight | ICA 100-40 |
DECEA’s rule allows accredited public response agencies to register emergency flights up to 24 hours afterwards. Civil society organisations, such as Nupef, must request authorisation before flying.
Aerial reconnaissance sheet
| Field | Record |
|---|---|
| Date, start and end time | |
| Pilot and observer (initials) | |
| SARPAS authorisation number | |
| Coordination notified (who and how) | |
| Take-off point (coordinates) | |
| Conditions: wind, rain, smoke, light | |
| Size of the affected area and hazards seen | |
| Chosen base location and reason | |
| Candidate network points (description and coordinates) | |
| Routes in and out | |
| Staging area for teams and resources | |
| Gathering or shelter areas for affected people | |
| People in danger reported to the coordination (time) | |
| Images kept and images deleted | |
| Notes |
See also
Last updated on